Guide
Not by default. Ask which class the exact build-up has, and ask for the report that shows it.

Gym turf is not fire rated by default, and neither is any other artificial grass. A fire class, such as Cfl-s1, is assigned under the European standard EN 13501-1, based on fire tests of the product in a defined build-up. The class then applies to what was tested: the turf, its backing, the fixing method and the substrate.
In Europe, construction products are classified for their reaction to fire under EN 13501-1. Reaction to fire describes how a material behaves when a fire starts. Does it ignite easily? Does flame spread across it? How much smoke does it produce? Floor coverings have their own set of classes. You recognize them by the letters “fl”, short for flooring.
There are seven classes for floors:
| Class | What the class requires |
|---|---|
| A1fl | No sustained flaming in the test, among other limits. |
| A2fl | Wider limits than A1fl, and a critical flux of at least 8.0 kW/m², as for Bfl. |
| Bfl | A critical flux of at least 8.0 kW/m². |
| Cfl | A critical flux of at least 4.5 kW/m². |
| Dfl | A critical flux of at least 3.0 kW/m². |
| Efl | Only the small flame test: the flame spreads no more than 150 mm within 20 seconds. |
| Ffl | Did not pass the Efl test: the flame spreads more than 150 mm within 20 seconds. |
How does a lab tell Bfl, Cfl and Dfl apart? It lays a floor sample under a radiant panel (test method EN ISO 9239-1). The heat is strongest at one end of the sample and weaker toward the other end. The lab ignites the sample with pilot flames and measures how far the flames spread. The heat level at the furthest point they reach is the critical flux. The higher it is, the less the flames can spread. Classes Bfl to Efl also have to pass a small flame test (EN ISO 11925-2), in which a small flame touches the surface for 15 seconds.
During the radiant panel test, the lab also measures smoke. Floors in classes A2fl to Dfl get an extra smoke class. s1 means the smoke did not exceed a set limit. s2 means the smoke did exceed that limit. Floors have only these two smoke classes. The classes for flaming droplets or particles (d0, d1, d2) that you may see on other construction products do not apply to floors.
Cfl-s1 combines three pieces of information:
So Cfl-s1 does not mean “non-combustible”. It means that flame spread and smoke stayed within the limits of the classification system in the tests.
Which class is required depends on the type of building, its use and its location, and on the rules in your country, region or municipality. Requirements differ between countries, and sometimes between regions of one country. Check with your fire safety adviser or the local authority before you order. They can tell you which class, if any, is required in your case. This guide is not legal advice.
A fire class is not a label that a turf fiber carries everywhere. It belongs to the build-up that was tested:
Change one of these layers, for example the adhesive or the backing, and the test result may change. The substrates and build-up the class applies to are called the field of application. If your installation falls outside it, the class on the report does not automatically apply to your floor.
Ask these questions before you order, whichever supplier you choose:
Pass the report on to whoever asked for the fire class.
A Tracktory track is a digitally printed sprint track, made to the size of your space, with a sturdy PVC backing as standard. Thanks to that backing, installation goes smoothly, and gluing is usually only needed for heavy use. Both the backing and any adhesive are part of the build-up. So tell us on which subfloor the track will lie and how you plan to install it.
Ask us about the fire classification of your track and build-up when you request a quote. If your building needs a specific class, also mention the class you were asked for. You can start in the configurator, or first read how installation works in the installation guide. See also gyms and fitness clubs and the custom sprint track.
Before you order
Design your track, tell us your subfloor and how you plan to install it, and mention any fire class you were asked for.